Invisible ship of the Russian fleet: on the building frigate Admiral to the fleet of Radyansky Soyuz Gorshkov. "Invisible ship" of the Russian fleet: which building frigate "Admiral to the fleet of the Radyansky Union of Gorshkov Frigates of project 22350 will be ordered


In service There will be 3 ships. For 2012, the fleet has occupied 6 ships. Less than 8 ships are planned. Main characteristics Water Tonnage 4500 tons (overall) Dovzhina 130 (most) Width 16 m litter 4.5 m Dviguni Diesel-gas turbine power plant Tension 65,000 l. With. (sharp)
2 diesel engines 10D49, 5200 l each. With.,
2 VMD M90FR pressure of 27,500 l. With. Speed ​​on the go 29 nodes cruising range 4000 nautical miles Crew 180-210 osib Restoration Artillery 1x1 130mm AU A-192M Rocket fire up to 16 anti-ship missiles ZM55 "Oniks" or 3M54 (motherland "Kalіbr-NKE")
SAM "Polyment-Redut" (32 SAM 9M96E or up to 128 SAM 9M100 in any combination)
2 ZRAK "Broadsword" Protichovnikove ozbroєnnya up to 16 91RE1 anti-terrorist missiles (the birthplace of Kalibr-NKE),
2x4 launchers for the PLO complex and PTZ "Packet-NK" Aviation group 1 helicopter Ka-27PL

History of design

Closing tender for the life of the lead ship to the project of the Viyskovo-Navy Fleet of Russia, allowing the voice to be heard on the cob in 2002. The preliminary design of the ship was split up at the Pivnichny design bureau and approved by the command of the Russian Navy in Chernivtsi 2003, prote through those that the ship's life was not included before the state defense, the tender was announced only in April 2005.

At the black rock at the military-marine salon IMDS-2005 near St. Petersburg, the head of the department for the design and supply of ships, marine defense and military equipment of the Ministry of Defense A. Shlemov was informed that the tender was to take part three shipbuilding enterprises: Pivnichna Verf , "Pribaltiysky plant" Yantar "" and FSUE "Sevmashpіdpriєmstvo". An application for participation in the tender was submitted by "Baltiysky Zavod", and on April 11, 2005, the group ІST, which Volodymyr "Baltiysky Zavod", that "United Industrial Company", which control "Pivnіchnu Verf", signed the Pleasure "About sleeping project implementation near the sphere of the Viysk ship. ”: the group of ІST goiters did not fight for military construction, as if it were possible to concentrate on the “Pivnichny shipyard” with the document; Baltiysky Zavod pleases minds to give partners all the necessary technological support at the vikonannі vіyskovyh zamovlen.

There is also a project for the development of frigates in project 22356 - a series of Russian rich-cylinder warships in the far sea zone.

History of everyday life

The frigate "Admiral Gorshkov" is getting afloat. Zhovten 2012 rock

The laying of the lead ship of this project - "Admiral to the fleet of the Radyansky Soyuz Gorshkov" was held on February 1, 2006 at the St. Petersburg shipyard "Pivnichna Verf". D.Yu. Silantiev became the ship's main alarm clock. Launchings on July 29, 2010. According to the plan, we may enter into action in 2012 rotation. The first surface combat ship, laid down at the shipyards of Russia for the rest of 15 years. For the upcoming 15-20 years, it is planned to build up to 20 frigates, the basis for which may become a ship project. Let's face it, they go to the warehouse of some fleets of the Russian Navy.

The exact number of ships planned before the week of the series is unknown, but for unofficial tributes, the Navy’s military plans to encourage a series of 10-12 ships of the 22350 project. It is planned to include six frigates in project 22350 to the warehouse of the Black Sea Fleet.

The cost of the lead ship of this type can be close to 400-420 million US dollars. With the improvement of the installation of new designs on the ship, which are being expanded at a time, the real price of the life of one frigate can be up to 500 million dollars.

Construction

Corps that nadbudova

The frigates of project 22350 are typical ships of a semi-tank design, with a supple nadbudovaya, vikonan, with a variety of composite structural materials based on polyvinyl chloride and carbon fibers (composite materials ensure a reduction in level the secondary field of the radio collection of the ship for additional claying and rosesing of the radio. over the life of the composite structural materials (“stealth”), the effective surface of the ship’s rosette is reduced, which in its line allows to reduce the radar and optical memory.

The stern edge is transom. The shape of the outline of the hull and the steerable bow can secure the ships to the project of the garni of the sea. Under the bottom of the bottom, stretching the greater part of the hull (from the bow windows with ammunition right up to the engine compartment and the stern inspection). On the ship, it is necessary to install new pitching arresters with kerms, which they do not climb in, in order to allow the change of commitment by the mechanisms of controlling the pitching arresters. The seaworthiness of the ship is responsible for ensuring the safety of the construction of that equipment without borders, with the right calmness of hitavice in the cold sea up to 4-5 points. The entire ammunition of keratinized missiles is transferred from the vertical launchers from the constructive shield.

For given data, the total water-tonnage of the ship in the warehouse is 4500 tons.

Main power plant

For the ship Yak GEU, a diesel-gas turbine power plant was selected with a hot exhaust of 65,000 liters. With. Power plant and two diesel engines 10D49 with a capacity of 5200 hp each. With. and 2 gas turbine engines M90FR with an exhaustion of 27,500 hp each. With. Speed ​​of a full run - up to 29 knots.

Restoration

UVP of the upgraded air defense system "Uragan"

The ship is carrying a complex of defenses, which is composed of ceramic missile, artillery, radio engineering and other types of defenses. At the bow of the hull in front of the nadbudovoy there will be placed two universal ship-based firing systems 3S14U1 (two standard modules in total on the top center), designated for the launch of sixteen anti-ship cruise missiles ZM55 "Oniks" or P-10 Brah Mos "Kalіbr-NKE" (3M- 54, 3M14, 91PTE2).

Oseredok UKBK Kalibr-NK with Chotirma types of missiles

The opposite side of the frigate will be represented by two side-by-side placements in the middle part of the nadbudov and (behind the hatches) Vedmedka-2 launchers for chotiri rockets in the skin.

The artillery armor of the ship is represented by the 130-millimeter artillery mount A-192 (shooting range up to 22 km, rate of fire - 30 shots per piece). Artillery system can have a wide range of shelling (170/80 °); the nomenclature of ammunition allows you to attack the coast, sea and strike targets, and the new radar system for controlling artillery fire 5P-10 "Puma", may have a rich channel for shelling purposes. Behind the helicopter hangar, two combat modules of the SPAR "Broadsword" are transferred on board.

There is still no exact data about the warehouse of anti-aircraft missile fire. More recently, there was information about the installation on the ship of the medium-range anti-aircraft missile system "Shtil-1" (upgrading the version of the Uragan air defense system in the version with a vertical launch), but later on, information appeared about the installation on the ship of the Poliment-Redut air defense system, pink forgiven in the nose part of the body in front of the UKBK ZS14U1 and it consists of 4 eight-middle modules. We have 32 48N6E2 SAMs (shooting range - 200 km) or 128 9M96E SAMs (chotiri replacing one 48N6E2, shooting range - 135 km) or 512 RVV- short-range self-defense missiles.

1 Ka-27 helicopter enters the air defense warehouse.

Project representatives

Name Board No. Virobnik Factory No. Bookmark date Launching Introduction to Diyu Fleet Mill Notes
Admiral to the fleet of Radyansky to the Union of Gorshkov Pivnichna shipyard (St. Petersburg) 921 1 fierce October 29, 2010 Moved to ignorance term Pivnіchny Fleet of the Russian Navy To be at a high level of readiness. The molding of the bud is finished. The radio electronic control is being restored. Trying it out in the spring of 2013 rock. Uvіyde to the 14th brigade of the anti-ships of the Pivnіchny fleet.
Fleet Admiral Kasatonov Pivnichna shipyard (St. Petersburg) 922 26 leaf fall (plan) leaf fall 2014 roku (plan) Black Sea Fleet of the Russian Navy The hull is formed, let's go.
Admiral Golovko Pivnichna shipyard (St. Petersburg) 923 1 fierce 2013 2014 Pivnіchny Fleet of the Russian Navy Mortgaged.
Admiral Isakov Pivnichna shipyard (St. Petersburg) 2012 (plan) Pivnіchny Fleet of the Russian Navy???? Plan to bookmark
Admiral Yumashev Pivnichna shipyard (St. Petersburg) 2013 (plan) Pivnіchny Fleet of the Russian Navy???? Plan to bookmark
Pivnichna shipyard (St. Petersburg) Contract signed
Pivnichna shipyard (St. Petersburg) Contract signed
Pivnichna shipyard (St. Petersburg) Contract signed

Div. also

  • Frigate project 11356R/M

Notes

  1. Kurochkin D.V.“Garne that great prayer of the future ...” // History of the ship: almanac. - 2006. - V. 9. - No. 1. - S. 8-9.
  2. "Pivnichna Verf" (St. Petersburg) launched the frigate "Admiral Fleet Radyansky Soyuz Gorshkov" Portnews.ru
  3. "Admiral Gorshkov" launches
  4. St. Petersburg Vіdomosti - Economy - Frigate, be smarter!
  5. The Black Sea Fleet takes 18 ships in ten years. Lenta.ru
  6. 22350 Gorshkov Gorshkov class
  7. "Pivnіchna verf" will be for the Russian Navy 17 warships
  8. The Ministry of Defense raises the price of Pivnichnoi Verf. Undertaking took away the new great contract
  9. Denis Korablev Project 22350

Shipbuilding plant "Pivnichna verf" continues life and mooring testing of the frigate project 22350 "Admiral flotu Kasatonov".

On 26 leaf fall 2009, the first serial frigate, another behind the rachunk, was laid down to project 22350 "Admiral flotu Kasatonov" with serial number 922.The work of the pre-budding stage has already been completed, the cable has been tightened, the installation of special equipment has been completed, and the main shock complex has been installed. The electrical installation work was completed, and it was ensured that it was overtaken by eating food on the head rose shield at the bow and stern power stations. Nin_ the ship is transferred to the staff visvіtlennya.

shipbuilders complete afloat centering of diesel engines, gas turbines, gearboxes and shaft lines. The shipbuilders started their cockpits on the frigate, the shipbuilders needed a lot of work, even though the number of the crew of the Kasatonov was close to two hundred osib. The very universe of a special warehouse is planned for the leaf fall of 2016. The first crew of the frigate went through training at that hour in the united initial center of the Russian Navy near St. Petersburg.

The corvette "Thunder" was equipped with lead engines >>

125 out of 163 and 64 moorings out of 245 were presented to the technical control of the shipyard and the deputy shipyard by the shipyard workers.

Project 22350 splitting the Pivnichny Design Bureau, the whole ship with a long-term pivnak and a strong nadbudovoy, so we don’t remember much on the enemy’s radars. That frigate project itself was nicknamed the "invisibles".The frigates are designated for conducting combat operations in oceanic and sea areas against surface ships and underwater bodies of the enemy, fighting attacks against repeated attacks as independently, as well as at the warehouse of the ships.

The Viyskovo-Navy Fleet of Russia will take over 15 frigates under project 22350 and their modifications - project 22350M. These ships will form the basis of naval groupings of the Navy in the Arctic zone, the Atlantic and the Mediterranean Sea.For their tactical and technical credentials, these ships can win the Navy at all latitudes of the sea and ocean zones without blame.

Zbroya and that radio engineering design of the ship to rob it with a universal one for stosuvannya. The stench can virishuvati broadly around the battlefield with surface ships, underwater ships and aircraft. The radio technical equipment of the frigates 22350 allows such a function of grouping at sea, as well as lighting the surface, surface and underwater conditions.Lead ship to project 22350, frigate "Admiral to the fleet of Radyansky Soyuz Gorshkov" , in a given hour to pass the state trials on the Pivnichny fleet. Vіn uviyshov to the TOP-10 of the best frigates of the 21st century, compiled by the American blog Defencyclopedia. Styling the rating was called yoga "the butt of a well-balanced ship».

Characteristics of the project 22350:

water tonnage - 4,500 tons;

Dovzhina -135 m;

Width - 16 m;

· Shvidkіst - up to 30 knots;

· cruising range - 4,500 miles;

· Autonomy - 30 dB;

· Crew - 210 osib.

Main power plant: DGTA with a hot potency less than 65,000 liters. With.

Revision:

The project 22350 ship carried an armored complex consisting of 16 Kalibr anti-ship cruise missiles, an A-192 130-millimeter artillery mount, an anti-ship complex "Packet-NK" and a medium-range air defense system.Aircraft alert: Ka-27 anti-aircraft helicopter.

"Vbivtsya" aircraft carriers >>

The main strike tool is the new universal ship firing complex 3S14U1 (UKZK). Zastosuvannya UKBK robbing the combat ship is rich, this combat recognition can be changed on the basis of a simple way to replace the options for ammunition.

New SAM type "P" oliment-Redoubt», V This warehouse includes missiles of three types: 9M96D long-range, 9M96E medium-range and 9M100 short-range. The rockets are located at the center of the vertical launch installation (VLR) in such a way that the launch warehouse can be combined in different proportions. One center can accommodate 1, 4 or 8 missiles, in that hour, as a leather UVP, it can have 4, 8 or 12 such centers.To check in to the warehouse of the Poliment-Redut air defense system, enter the stationwith chotirma antenna phase graters, which will ensure a circular look. The fire control system ensures one-hour shelling with 32 missiles up to 16 repeated targets - 4 targets per skin PAR.

The vertical launch of missiles is carried out in a "cold way"- for the help of a squeezed wind. When a rocket reaches a height of about 10 meters, the main engine is switched on, and the gas-dynamic system starts turning the rocket at the bik meti. The 9M96D/E missile guidance system is combined with inertia and radio correction at the middle distance, and with active radar at the end distance of the trajectory. 9M100 short-range missiles can fire an infra-red homing head. In this order, the complex will be able to have three air defense systems of different range, which will ensure the safety of the ship’s air defense system from the congestion of a significantly smaller number of koshtiv. High fire productivity and accuracy of targeting with a warhead directed to put the Poliment-Redut complex among the first in the world for efficiency both against aerodynamic and ballistic targets.

At the given hour SAM "Polyment-Redut" is being installed on the corvette of the project that will be 20380(starting from another ship - “smart”) and a frigate of the Gorshkiv type, project 22350. Nadal yogo, obviously, will be installed on promising Russian destroyers.

The current Russian naval fleet is going through a new period of technical re-equipment. To undergo a revision of the great naval state, which was in the recesses after the collapse of the Radyansk Union. Hopelessly old ships are taken out of the warehouse of fleets and go to decommissioning. Other military ships, piznishoy argue either to stand on the factory wall, looking to their distant share, or to undergo modernization. However, life should not stand on the mission. The fleet continues to replenish with new, modern combat units. To replace the old, more Radyansk missile cruisers and great anti-terrorist ships, the new generation of combat ships will be introduced to the fleet.

At the warehouse of fleets there are small missile ships and corvettes, guarding the maritime borders of the country. However, a special place for raising the combat potential of the fleet hopes to build ships in the distant maritime zone this year. In this aspect, the current naval command is able to place a bet on project 22350 frigates and replace old missile cruisers.

Modern frigate for the domestic fleet

The appearance of a frigate at the warehouse of the Russian fleet as a class of combat ships is not a new phenomenon. Starting from the dobi of the glass fleet, on the ship of the first class, laying the most work. Russian frigates carried battle lines and reconnaissance on the nearest approaches to coastal objects, took part in the battles at the warehouse of the line forces. From the ear of the steam fleet, the frigates, like a class of combat ships, were stunned into the darkness. Cruisers took over the place. Maizhe, for 50 years, the frigates emerged from the fields of dawn. Just after the end of the Other World War, it was time for these ships to appear again in the expanses of the ocean of light. The new ships quickly occupied their niche in the combat warehouse of the foreign fleets, leaving space in the battle formation between destroyers and cruisers.

At the Radyansk Union, on the authority of the fleets of other lands, ships of the frigate class buv, the classification of ships was adopted for recognition. The functions of the frigate beat out patrol ships. Behind their functional capacities and combat equipment, the Radyansk guards were full-fledged combat ships, building not only activities in the coastal zone, but also vikonuvaty a wide range of zavdan on a significant day in the air bases. After the collapse of the Soviet Socialist Republic, the Russian Navy underwent a reform, as the classification of combat ships was pushed. The mustache guards of the Great anti-ships, which are at the warehouse of the fleet, were retrained to frigates.

The future of new ships of a similar type, Russia rozpochala less than a new thousand, if the old guard in the special number of BODs and missile cruisers of the Grozny type residually established their positions.

New frigates to project 22350, which are to be put into action, are to blame for the breach, which is the culprit after the decommissioning of the missile cruiser project 58 "Admiral Golovko". The ship itself, having become the remaining representative of the class of combat ships, owing to its tactical and technical characteristics, frigates were more predicted. The modern frigates are guilty of becoming a hard hitting element for the fleet, having strengthened their presence in the Russian fleet at any point in the ocean of light.

According to its tactical and technical characteristics, the ship to the project 22350 is due to the mother, the cruising range is over 4 thousand. miles and autonomy of swimming 30 deb. For the water-tonnage and the warehouse for the construction of new ships, three ships are transferred to missile cruisers of the Slava type, overturning the rest of the defense, electronic and technical equipment and fire control. The plans of the Viysk-Marine Architecture to create new frigates of project 22,350 have a new core for the fleet of the open sea.

On the back it was planned to use new combat units to strengthen all Russian fleets. However, the decision to concentrate on equipping the Black Sea Fleet with new ships was praised.

Created by the project 22350 that program of everyday life

Vіdpovіdno to the old klаsifіkatsії novy ship svoryuvavsya like a patrol ship, rozrahovany on swimming far from the main place of deployment. As before, the Pivnichne PKB, one of the most direct business enterprises, took up the project. In 2003, after the completion of the implementation of the design parameters according to the technical requirements, the project under the number 22350 was approved by the Higher Military and Marine Architecture of the Region.

According to the state program, the implementation of the project transferred the life of 20 ships of this type. On weekdays, the introduction of new frigates into service took 15-20 years. Budіvnitstvo is planned to be carried out at four shipyards: at the Baltic Shipyard, the Kaliningrad Shipyard "Yantar", at the Pivnіchnіy shipyard and at the Admiralty shipyard in St. Petersburg.

The first contract for the life of the frigate project 22350 was awarded to the tender by the Pivnichna Verf Shipbuilding Plant, on the 1st of February 2006 the lead ship of the Admiral Gorshkov frigate series was laid down. Problems with the technical equipment of the new ship and the choice of the optimal system for ships of this class led to the fact that the Admiral Gorshkov was over 4 years old. The descent of the ship took place on 29 June 2010, after which the Ministry of Defense signed two more contracts with St.

"Pivnіchna Verf" was selected as the only and most important ship-operator of the project 22350 for the domestic fleet. Usy zamovleni to encourage the court to find a way not earlier than 2019. Now it is planned to conduct the life of the ships for the final project 22350M.

The introduction of the frigate "Admiral Gorshkov" into operation was greatly delayed. Until today, the ship will go through state trials. From this moment in the history of the program of the everyday life of combat ships of this class, the cycles of moments are broken. The first ship of the series, the frigate "Admiral Kasatonov", was laid down in 2009, the rest of the production was delayed even more. In 2019, the ship was launched into the water. The introduction of the ship into the ship was less than 2019 for the minds of the exact completion of all the minds of the contract.

At the forums on the Internet, there was an active controversy on the topic of what caused the main reason for such a delay in the introduction of new ships. Any other thoughts, prote nayimovirnishe, the main factor of such a trivial life of both ships is crying in the dissatisfied technical station of the main ship nodes and units.

Today you can find information on the forums, de it is said that on the lead ship of the frigate "Admiral Gorshkov" during the factory tests, the main rukhova installation was out of tune. Instead of repairing the ship, they installed a similar gas turbine engine, taken from another ship. The engine, which was in good order, was planned to be repaired and additionally repaired, after which the donor wanted to install it on the ship.

The main marching engines for the frigates of project 22350 were prepared by the Ukrainian enterprise Zorya. Prior to the decision of the RNBO of Ukraine, the supply of gas turbine units for equipping Russian frigates has been ordered.

The development of analogues of the Ukrainian version was developed at the NVO "Saturn" and it is possible to revisit Ukrainian components from the design of Russian warships.

The rest of the news for 2019-2016 is to inform you that the lead frigate of project 22350 made a trial crossing from the Baltic to the White Sea, passing independently over 2 yew. nautical miles. Combat launches of anti-ship missiles were carried out at the firing range from the ship, anti-aircraft missile systems were tested. The praise of the residual decision about the acceptance of the ship to the warehouse of the dignified fleet is cleared up.

Another ship from the rich-suffering series, the frigate Admiral Golovko, was laid down in 2012. The vessel took the name in honor of the leading Radyansk naval commander Arseniy Grigorovich Golovka and could continue the fighting traditions of her predecessor, the missile cruiser of project 58 "Admiral Golovko".

This combat ship, switched off from the warehouse of the fleet in 2002, having continued to carry out combat service on the Black Sea for over 30 years. For water-tonnage, this type of construction and ships are most predicted by modern frigates. On missile cruisers, similar to the "Admiral Golovkom", it was necessary to command the vikonnanny of combat commanders and the demonstration of ensign in different regions.

The launch of a new ship with the same name is scheduled for 2019. The rest of the news from the slipway to tell about those that the ship can be more than 50% ready. Until then, the delivery of the gas-turbine power plant of the NVO "Saturn" at the appointed term is known under the power.

The third ship of the series "Admiral to the Fleet of Radyansky to the Union of Isakiv" was laid down at the Pivnichny shipyard near the fall of the leaves in 2013. Like with the previous ships of the project 22350, the food for the timely introduction of a combat unit into the day is rebuying for meals.

Design features of ships project 22350

On the back, the frigate was designed like a ship with high seas. The ship's hull has a long water tank, which ensures good seaworthiness of the ship for the minds of stormy weather with a windfall of 4-5 points. On the corps there are installed bouncers of pitching with kerms, which cannot be climbed.

The Nadbudova frigate is made of composite materials, thus reducing the radio-acoustic background of the vessel. The physical fields of the new ship have been reduced to a minimum. The "stealth" technology, as it is embedded in the design of the ship, makes it incomprehensible for the radars of the ship's enemy. Vessel's survivability is ensured by a floating bottom, which is 70% stretch of the hull and a universal fire extinguishing system.

Energy plant

The main rukhova installation on new frigates today is represented by two HMD M90FR with a total pressure of 55 thousand. l. With. Dviguni is the result of a joint work of the Russian NVO "Saturn" and the Ukrainian NVP "Zorya-Mashproekt". Gas turbine installations with engines of the 4th generation and buildings provide ships with high speed and running characteristics. The maximum speed of the vessel for the forced mode of the robotic power plant is 29 knots.

Economical running is provided by two diesel engines 10D49 pressure 5200 l. leather With an economical course of speed of 14 frigates, the building frigate can reach up to 4,000 miles.

Resetting systems

Starting from the lead ship "Admiral Gorshkov", it is planned to equip the new frigates with the most advanced defense systems. For tightness, that type of frigate can be mentally brought closer to missile cruisers of the Grozny type. The main strike force of the ship is used in 16 Moskit anti-ship missiles, as a modification of the Kalibr-NK missile system. Like other new Russian combat ships, the frigates are equipped with the A-192 universal automatic artillery mount.

Krym of offensive attack, ships of project 22350 mali equipped with new anti-terrorist complex "Vedmedka-2". Vіdmіnna rice to the complex was believed by the fact that rockets were launched from vertical mines buried near the hull of a warship. The hydroacoustic station of the underwater horizon was assessed by the Vignetka-M system;

The anti-aircraft defense was built up by the modules of the Redut anti-aircraft missile system. Around anti-aircraft missiles, threats from repeated attacks for combating small-scale targets on the sea may resist the universal missile-harmony complex "Broadsword".

As an addendum to the main types of construction of all the vessels of the Ka-27 helicopter project.

The situation with the course of everyday life and the introduction of the frigates to the project 22350

The camp for 2019 only the lead ship can be prepared before entering the fleet. Zatrimka from the introduction of the ship to the tune of the Bula Viklikana was a practical necessity. On the frigate "Admiral Gorshkov" all types of armor were carried out, as they will be installed on the serial military vessel. Today on the ship, it is time to carry out the rest of the testing of all the main systems of the ship. Practical advice, ottrimaniya as a result of research and testing is guilty of the article in good fortune for the creation of an optimal set of frigates in the use of the admiral's line. There are three ships in Crimea, which have already been materialized in metal, until 2020 the Russian Navy may have more than ten new ships. It is planned to give names to all ships for the advancement of Russian naval commanders.

The greatest skepticism is caused by the camp of another ship of the series, the frigate Admiral Kasatonov. On the ship, assembly and mechanical works are carried out from finishing the rukhovo installation. Due to the advice of the military experts and shipbuilders, the turbine itself was left to be installed on the ship. All other nodes and units are installed and connected and connected. The readiness of the ship is estimated as 80%. All electrotechnical part of that electromechanical possession has long been rebuying at the finished station. Finished bringing the ship's systems for further transfer of the ship to the crew. Throughout 2019, a phased installation of launch systems on a combat ship was carried out. On the back of the frigate, launchers of the PRK were installed, and then the installation of PPO systems of the ship and artillery fire was carried out.

The first serial episode may be handed over to the fleet for example 2019, on the cob 2019. After the laying of the ship, not a lot, not enough 8 years passed.

Another serial ship, the frigate "Admiral Golovko" is expected to be released in 2019 before the program of life. However, work is being carried out on the ship with a hull and I don’t know about food for the new frigate of the gas turbine plant. NVO "Saturn" is about to transfer gas turbine engines to the ship in the fourth quarter of 2019. Assessing the life of everyday life, you can build up the windmills that the ship will be put into operation for the most optimistic estimates no earlier than 2020.

From the moment of laying down the third serial frigate "Admiral Fleet Isakov" (leaf fall in 2013), 3.5 years have passed. For the summer of 2019, it is planned to rozpochati installation and installation on the ship of the rukhovo installation. As with the front sister ships, the emergency building of a warship and the sooner the ship was put into operation are recognized. Trival waking up of ships on this day has become the reason that a lot of the ship can already be taken in old. The rapid development of electronics, which was reminded of the remaining fates, becomes the reason why the combat modules of the ship's control system are quickly obsolete.

Russian new ships of the ocean class frigates of project 22350 will be launched over 11 years ago. Regardless of this age, combat ships have not yet lost their main tactical and technical characteristics. Technological resource for the project has secured the financial backlog for the further life of the ship and its operation. Practically all the ship's systems and combat modules are the most respected today. While the hull of the ship has such aesthetics, the Russian frigates are a competitive pose. There are still no similar sights in foreign fleets.

The technological plan of the ship project 22350 is being prepared. The trials of wakefulness and the practical testing of the head ship prepared the virobnic tensions for the next hurdle of future deaths.

If you have any food vinicks - remove them from the comments under the article. Mi chi ours vіdvіduvachi z gladіstyu vіdpovimo on them


Patrol ship (TFR) of the far sea zone / frigate. The project of splitting the Pivnichniy design bureau and approving the commands of the Russian Navy near Chervnya 2003. (date of confirmation of the draft design). The competition for the life of the TFR series was announced by the Navy on February 28, 2005. The competition was attended by the shipbuilding enterprises "Pivnichna Verf", "Baltic plant" Yantar "" and PZ "Sevmash". An application for participation in the competition was also submitted by the Baltic Plant, on April 11, 2005. ІST group, which is part of the Baltiysky Zavod Volodymyr, and the Joint Industrial Company, which controls the Pivnichnu Verf, signed the Agreement “On joint implementation of projects in the sphere of the Viysk shipbuilding industry”, in recognition of all defense deputies The events were concentrated on Pivnichniy Verf ". First of all, it was planned to start a series of 20 ships with a stretch of 15-20 years, and then until the end of 2010. in ZMI the figure was called 10-12 ships pr.22350. Within the framework of the State Program, purchases were made until 2020. March 17, 2011 "Pivnichna Verf" and the Ministry of Defense of Russia signed a contract for the construction of 4 ships of the project (for an additional two, which will already be). In addition, the shipyard "Pivnichna Verf" was recognized as the only postal worker of the TFR pr.22350 for the Russian Navy.

The contract for the operation of the lead ship of the project was signed by Shipyard "Pivnichna Verf" on 21 July 2005. The ship "Admiral to the fleet of the Radyansky Soyuz Gorshkiv" (serial number 921) was laid down at the "Pivnichny shipyard" on February 1, 2006, launched on July 29, 2010. The ship was planned to build the Russian Navy in 2011. (plan the cob in 2010), and then in 2011 yak imovirna date of transfer of the ship to the Navy is called leaf fall 2012 r. Later, the plans were changed several times. The lead ship was tested on the way to the project "Admiral to the Fleet of the Radyansky Soyuz Gorshkov" according to the spring statements of ZMI to be cleared up to the end of the leaf fall of 2012, which is doubtful, leaving the actual camp of the ship. So, tse povіdomlennya ZMI was requested by the representative of the USC on the cob of leaf fall in 2012. about those in the fall of 2012 moorings will be tested on the ship, and the first sailing at the sea is planned for 2013. Piznishe, 19 leaf fall, 2012 Oleksandr Ushakov, General Director of Shipbuilding Plant "Pivnichna Verf" Oleksandr Ushakov, stating to ZMI that "why can we finish tightening the cable routes? you are tested at the factory. The results of the 2013 r. pinkish mooring, and in 2014 p. running test of the lead frigate. The acceptance of the ship by the Fleet was recognized in 2014, later - at the infant in 2015, later - at the infant in 2016. І as a result we started on the cob 2017 be cleared until the end of 2017 The main reasons for the blockage are the unavailability of the launch complexes (SAM "Redut").

Transfer of the head frigate to the Fleet by camp on birch 2017 score in 2018

The first serial ship of the project "Admiral Fleet Kasatonov" was laid down there on November 26, 2009, the launch of the ship is planned for 2012.


Frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkov" pr. ().



Frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkov" project 22350 (photo from Curious archive, http://forums.airbase.ru).



Frigate "Admiral to the fleet of Radyansky Soyuz Gorshkov" project 22350, 30.09.2013 (photo from Curious archive, http://forums.airbase.ru).



Frigate "Admiral to the fleet of Radyansky Soyuz Gorshkov" project 22350, 07/25/2013 (photo from Curious archive, http://forums.airbase.ru).


http://forums.airbase.ru).


Malyunok TFR "Admiral to the fleet of the Radyansky Soyuz Gorshkov" project 22350 (http://paralay.com).


Construction: a ship of dovgopolubachnoy architecture, with a succulent overbud. Nadbudov Vikonan with the selection of composite structural materials based on polyvinyl chloride and carbon fibers for the size of which the value of the secondary radar field of the ship was reduced. The physical fields of the ship are minimised. The beginning of the original architecture of the superstructure and the choice of composite structural materials (stealth) has reduced the effective surface of the ship's rosette, which at its edge allows to reduce the radar and optical noise.

The stern edge is transom. The shape of the outline of the hull and the steerable bow can secure the ships to the project of the garni of the sea. Under the bottom of the bottom, stretching the greater part of the hull (from the bow windows with ammunition right up to the engine compartment and the stern inspection). On the ship, it is necessary to install new pitching arresters with kerms, which they do not climb in, in order to allow the change of commitment by the mechanisms of controlling the pitching arresters. The seaworthiness of the ship is responsible for ensuring the safety of the construction of that equipment without borders, with the right calmness of hitavice in the cold sea up to 4-5 points. All ammunition of ceramic missiles is transferred from vertical launchers from constructive protection

Engine installation: diesel-gas turbine unit type CODAG, 2 x diesel-gas turbine units DGTA-M55R, which include:

2 x gas turbine units (VMD) of the 4th generation M90FR/DA91 at 27200 k.s. / 27500 k.s., placed at the bow engine room; installation of a double-deck building of the NVO "Saturn" (m. Ribinsk) and the NVP "Zorya-Mashproekt" (Ukraine, ).

2 x diesel engines 10D49 at 5200 k.s. with dvoshvidkіsnimi reducer gears, placed at the stern engine compartment;
The frequency of wrapping the crankshaft is 1000 rpm.

Reducer RO55R - ensures the distribution of the diesel engine and turbine. Control system "Metel-55".

The development of a diesel-gas-turbine unit was expanded in 1993. Intermediate testing of AMD M90FR was carried out in 2006. that interim testing of the M55R installation was carried out in 2008. Spіlniy pripriєmstvo HALL "Turborus" camp on the cob 2013 r. ).


Energy- 4 x diesel generators ADG-1000NK produced by the Ural Diesel Engine Plant (UDMZ).

TTX of the ship:

Restoration:

Project 22350
Project 22356
RCC 2 x 8 x Universal Ship Firing Complex (UKBK) 3K14 "Kalіbr" - vertical launcher 3S14U1, missiles to the "Kalіbr-NK" complex (3M54T, 3M54T1, 3M14T, 91RT2) with a range greater than 3
similarly
SAM 2 x vertical launchers for 14 missiles complex, ammunition - type 28 to 112 missiles class 9M96 or similar. The control system for the complex with the "Poliment" radar with 4 HEADLIGHTS is able to see targeting at once for 16 targets (4 per HEADLIGHT).
The pace of the shooter - 1 ZUR / sec
SAM "Rif-M" (ammunition 32 missiles) or SAM "Shtil-1" (ammunition 36 missiles)
MANPADS 2 x "Golka-M"
Artillery 1 x 130 mm artillery mount from SU 5P-10 "Puma" with a new model of the antenna post.

Vletka 2012. the distribution of the A-192M installation was pinned, the distribution of the artillery installation of the DKR "Kartaun" was painted.

Zhovtni 2012. there was information about the inflow of 2012. rozrobki artillery installation. Later, in the middle of the leaf fall of 2012, it became clear that the distribution of the 130 mm artillery mount for the Cartown DKR was announced. Camping for the end of the month of 2013 the other ship of the project (factory No. 922) is being prepared before the installation of valolin and twine, and, possibly, it will be launched into the water.

similarly
Additional information 2 x 14.5 mm trowels on MTPU rigs
similarly
ZRAK / AK 2 combat modules 3Р89 ZRAK "" from 2 x 2 x 4 PU ZUR 9M340
similarly
Torpedo vehicles 2 x 6 x launchers SM-588 complex
similarly
RBU -
Statement pereshkod 2 x PU KT-308-05
8 x PU KT-216 / complex
similarly
Gvintokril landing maidanchik and hangar for a Ka-27 helicopter similarly
More


Model of the 3S14E vertical launcher at one of the IMDS saloons near St. Petersburg (http://paralay.com).


Installation of a vertical launch of 3C14 on vitroprobes (http://paralay.com).


A baby of the vertical launcher 3S14E on one of the salons of the MVMS near St. Petersburg, reconstruction behind photographs (c) 2012. http://site


130-mm artillery mount A-192M on the frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkiv" project 22350, tested at the Pivnichny fleet, autumn 2015. (video frame from testing).


ZRAK "Broadsword" on the frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkov" project 22350, camp on the other half of the day 2013 (photo from sevstud1986 archive, http://forums.airbase.ru).


ZRAK "Broadsword" on the frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkiv" project 22350, 25 April 2013 (photo from Curious archive, http://forums.airbase.ru).


ZRAK "Broadsword" on the frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkiv" project 22350, tested on the Pivnichny fleet, autumn 2015. (video frame from testing).


Settlement:
Project 22350
Project 22356
Bius Sigma-22350
Sigma-E22356
Radar detection of sightings and surface targets and control of air defense systems
5P20K () "Poliment", 2 HEADLIGHTS / 4 antenna arrays - the radar was installed on the lead frigate in the autumn of 2012, and then covered with wooden roofs
no
Radar for detecting sightings and surface targets 5P27 "Furke" (production of NVO "Pravdinsky Radio Plant")
"Frigate-M2EM"
Radar targeting anti-ship missiles 34К1 "Monolit" / BAND STAND ??
"Mineral-ME"
Navigation radar 3-4 pcs
similarly
Radar system keruvannya fire artillery installation A serial version of the 5P-10 "Puma" system with a laser far-reaching world (right-handed in the figure - div. below) of the development and vibration of the NDI "Pole". Evil in fig. (div.below) - TV system. On the lead ship (serial No. 921) an additional information was installed for the A-192M artillery system. ().
similarly
Radar for stern artillery mounts
Others be careful Optoelectronic system
Rich functional TV complex MTK-201M
MTK-201ME
Navigation inertial system
GAK "Zorya-3", due to unconfirmed tributes, DAC "Zirka" was installed on the lead TFR factory No. 921
"Zorya-ME-03"
Towed GAS "Vinyetka-M" "Vinyetka-EM"
Electronic protidium complex REB "Prosvit-M" (2 x launcher KT-308
8 x PU KT-216)
complex REP TK-25E
Station for the detection of laser enhancement
Zv'yazku complex Satellite communication complex "Tsentavr-NM"
General-operational control system
More


5P27 "Furke" target radar (http://www.npo-prz.ru).


Anlonny post of radar 5P27 "Furke" on the frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkiv" project 22350, tested on the Pivnichny fleet, autumn 2015. (frame of video from testing,).


Antennas for the control system of artillery 5P-10 "Puma" and radar 5P27 "Furke" on the frigate "Admiral Fleet Radyansky Soyuz Gorshkiv" project 22350, 14 leaf fall 2012. (photo from Curious archive, http://forumsair.ua) .


5P-10 "Puma" artillery control system post antennas, 5P27 "Furke" radar and 5P20K radar antennas with headlights under wooden caps on the frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkiv" project 22350, 25 lime 20 ://forums.airbase. ru).


Antenna posts on the frigate "Admiral to the fleet of the Radyansky Union Gorshkiv" project 22350, 30.09.2013 (photo from Curious archive, http://forums.airbase.ru).


Antennas sent to the frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkiv" pr. (photo from sevstud1986 archive, http://forums.airbase.ru).


Radio engineering on the frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkiv" project 22350, tested on the Pivnichny fleet, autumn 2015. (video frame from testing).


Antenna post of the control system of artillery 5P-10 "Puma" for the frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkiv" project 22350, 14 leaf fall 2012. (from Vova-r archive, http://forums.airbase.ru).


Combat posts on the frigate "Admiral to the fleet of the Radyansky Union of Gorshkiv" project 22350, tested on the Pivnichny fleet, autumn 2015. (video frames from testing).


Modifications:
Project 22350- basic model of TFR/frigate for the Russian Navy.

Project 22356- frigate, export version, camp for the end of 2011 not implemented. 07/04/2013 the press service of "Pivnichnoi verf" informs about the readiness of contractions for the production of the export version of the frigate project 22356 ().


Project 22350M- Significantly modernizing the frigate version - changing the radio-electronic control, new systems of protection (sea version of the S-500 air defense system, too).


Imovirno, sketch of the frigate prp.22350M - it was previously considered that the image of one of the options for the layout of a promising destroyer for the Russian Navy - NDR "Leader". Frame of the video clip from the website of the Morinformsystem-Agat concern, http://www.concern-agat.ru/).


Vartist one ship project for ZMI tribute to become close to 18 billion rubles. ( ist - CAST).

Status: Russia


TFR "Admiral to the fleet of the Radyansky Union of Gorshkov" project 22350 after launching, July 2010 (photo by M.Liberman, http://forums.airbase.ru).


Bіlya dobudovnoї stіni CVD "Pivnіchna verf", m. St. Petersburg. To the right: SKR "Boykiy" pr. 20380, SKR "Kmitlivy" pr. Photo from helicopter, April 25, 2011 (http://forums.airbase.ru).


- 2011 May 26 - on slipway No. 4 of the shipyard "Pivnichna Verf" an unofficial internal plant laying of the ship pr.

2011 autumn - the first installation A-192 was prepared by the Arsenal Production Association and was tested at the test site before being installed on the main TFR pr.


Golovny TFR pr.22350 "Admiral Gorshkov", Pivnichna shipyard, St. Petersburg, 10/17/2011 (photo from the archive of supplements808, http://forums.airbase.ru).



Golovny TFR pr.22350 "Admiral Gorshkov", Pivnichna shipyard, St. Petersburg, 25.01.2012 (photo from sevstud1986 archive, http://forums.airbase.ru).


Livoruch factory No. 1004 - SKR "Styyky" (stock No. 1). In the center - slipway No. 2 - factory No. 1005 SKR "Groom". On the right - slipway No. 3 - TFR "Admiral Kasatonov" project 22350. CVD "Pivnichna Verf", m. St. Petersburg. February 01, 2012 (http://forums.airbase.ru).


Stapel No. 3 - factory No. 922 of the TFR "Admiral Kasatonov" project 22350. CVD "Pivnichna Verf", m. St. Petersburg. February 01, 2012 (http://forums.airbase.ru).


Building berth No. 4 - factory No. 923 SKR "Admiral Golovko" project 22350, bookmark. CVD "Pivnichna Verf", m. St. Petersburg. February 01, 2012 (http://forums.airbase.ru).


- 2012 07 fierce - the newspaper "Komersant" with a message to the Ministry of Defense of the Russian Federation informs that the development program has been changed until 2020. number of SKR project 22350 - 8 units.

2012 April 2 - the press service of "Pivnichnaya Verf" announced the plan for the production of the first TFR pr.22350 - on the lead ship of the project in January 2012. to open the mooring lines, the building of the ship of the Navy is planned for the fall of the leaves in 2013. in leaf fall 2012). The first serial ship pr.22350 will be handed over to the Navy at the fall of the leaves 2014.


Frigate "Admiral to the fleet of Radyansky Soyuz Gorshkov" project 22350, May 2012 (photo from Curious archive, http://forums.airbase.ru).


Frigate pr.22350 "Admiral to the fleet of the Radyansky Soyuz Gorshkov" at the production site at the "Pivnichniy Verf", St. Petersburg, May 30, 2012 (photo - A. Akentiev, http://forums.airbase.ru).


Frigate "Admiral to the fleet of Radyansky Soyuz Gorshkov" project 22350, spring 2012 (photo from Curious archive, http://forums.airbase.ru).


- 2012 14 leaf fall - as a guide to the published photograph of the frigate "Admiral to the Fleet of the Radyansky Soyuz Gorshkiv", which is found in the yard of the "Pivnichnoi Verf" in St. th fire "Pu. Radar s HEADLIGHTS have not yet been installed, a radar of the "Monolit" type has not been installed, as well as the current artillery installation of the head caliber, and, moreover, the BREO systems are still low.


Frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkov" project 22350, 14 leaf fall, 2012 (photo from Curious archive, http://forums.airbase.ru).


Frigate "Admiral flotu Kasatonov" near the building at "Pivnichniy verf", 14 leaf fall, 2012 (http://forums.airbase.ru).


Frigate "Admiral to the fleet of the Radyansky Soyuz Gorshkov" pr.22350, camp on the other half of the leaf fall 2012 (photo from sevstud1986 archive, http://forums.airbase.ru).


Frigate "Admiral to the fleet of Radyansky Soyuz Gorshkov" project 22350 (photo from sevstud1986 archive, http://forums.airbase.ru).


- 2013 April 25 - ZMI is informed about the request to the senior alarm clock of the head appointment No. 921 Kiril Madzyuta, that the ship’s appearance on the factory moves was tested in 2013. In the waters of the Finnish inflows, they are recognized as the main power plant, navigational equipment, complex. Then, for the continuation of the ZXI, the frigate will move to Baltiysk, and the testing will be completed on the Pivnichny fleet.

2013 31 linden - the press service of "Pivnichnoi Verf" informs that the mooring of the lead frigate pr. At the mooring passages, which will be carried out on the shipyard’s pre-budding wall, it will be checked the quality of the installation, the operation of all mechanisms and the operation, wash their maintenance before entering the factory passages of the trial. On the frigate, we will change the work of mechanical control - diesel generators, compressors, refrigeration machines, air conditioners, pumps, the main power plant of the ship. Particular respect will be given to the navigational installation and the linkage complex, necessary for the ship's exit from the sea. The beginning of the first stage of factory running tests of the frigate is scheduled for mid-autumn 2013.

2013 24th day - the trial of the lead frigate pr. after the installation of the main artillery system on the ship - A-192. The representative of the plant "Arsenal" told ZMI that the unit will be delivered to the CVD on the cob in 2014. ().


View from the sea of ​​the first serial frigate "Admiral to the fleet Kasatonov" pr. (http://www.nordsy.spb.ru).


– 2014 – as a matter of course, the first stage of sea trials of the lead frigate "Admiral Fleet of the Radyansk Soyuz Gorshkiv" project 22350 was completed. For unofficial information, a delivery ship for the repair of a DEU at the Pivnichnu Verf.

Register of TFR / frigates project 22350:

No. pp project factory no. factory mortgages launching joining the diyu note
01 "Admiral to the fleet of Radyansky to the Union of Gorshkov" Project 22350 921 Shipyard "Pivnichna verf" (m. St. Petersburg), senior budiver D.Yu. Silantiev (as of April 2013 - Kirilo Madzyuta)
01.02.2006
breast plan 2009 (2009)

29.10.2010

plan - lyuty 2009 (2006)

plan - 2011 (born 2009-2010)

plan - leaf fall 2012 p. (2011)

plan - leaf fall 2013 p. (04/02/2012)

plan - breast 2014 (summer 2014)

plan - until the end of 2016 (2016)

plan - first half of 2017 (24.12.2016)

the plan is the end of the lime 2017. (25.01.2017)

March 24, 2017 it was stunned that the terms of the ship’s delivery under the threat of vision through problems with bringing the Redut air defense system ()

plan - 2017 (March 29, 2017, Vice General Director of Shipyard "Pivnichna Verf")

Baltic Fleet. 02/01/2012 there was information about those that the ship after the completion of testing will be based on the Pivnichny fleet
02 "Admiral to the fleet Kasatonov" Project 22350 922 26.11.2009
plan - 2011 (2009)

plan 2012 (2010)

forecast - worm-lipen 2013 (03/24/2013)

October 30, 2014 sightings at the launching dock
launching - chest 2014

plan - 2012 (2009)

plan - leaf fall 2014 p. (2010, 04/02/2012)

plan - 2018 (March 29, 2017, Vice General Director of Shipyard "Pivnichna Verf")

Black Sea Fleet. In breasts 2014 there was information about those that the ship is planned to base on the Pivnichny Fleet

2011 - shaped hull.
– 2011 delivered diesel generators ADG-1000NK (4 pcs).
- 2013 cob - after the completion of the testing, it was planned to put DDTA M55R ().

03 "Admiral Golovko" Project 22350 923 Shipyard "Pivnichna verf" (m. St. Petersburg), senior budіvelnik - A.V.Nikotin ()
plan 2011 (2010)

May 26, 2011 (cob of cutting metal)

plan November 26, 2011 (19.06.2011)

02/01/2012

plan 2013 (19.06.2011)

plan - end of 2015 (2014)

plan - 2016 (20.02.2015)

plan - 2017 (24.12.2016)

plan - 2014 (19.06.2011)

plan - 2019 (March 29, 2017, Vice General Director of Shipyard "Pivnichna Verf")

Pivnіchny Fleet

The contract for life was signed on 03/17/2011.

The laying of the ship is planned for 02/01/2012, but the robots on the ship will be released later (inf. as of September 2012).

04

"Admiral to the Fleet of Radyansky Soyuz Isakiv"

(Standing for 2011 was information about the possible name - "Admiral Yumashev")

Project 22350 924 CVD "Pivnichna Verf" (m. St. Petersburg) plan - summer 2012 (02/01/2012)

plan - 11/14/2013 p. (30.07.2013)

November 14, 2013

- plan until 2018 (2011)

plan until 2025 (2016, )

05 no data Project 22350 925 ?
CVD "Pivnichna Verf" (m. St. Petersburg) - - plan until 2018 (2011)

plan until 2020 (2013)

plan until 2025 (2016, )

The contract for life was signed on 03/17/2011.
06 no data Project 22350 926 ? CVD "Pivnichna Verf" (m. St. Petersburg) - - plan until 2018 (2011)

plan until 2020 (2013)

plan until 2025 (2016, )

The contract for life was signed on 03/17/2011.
07 no data Project 22350 no data CVD "Pivnichna Verf" (m. St. Petersburg) - -
08 no data Project 22350 no data CVD "Pivnichna Verf" (m. St. Petersburg) - - plan until 2020 (02/07/2012) announced by the newspaper "Komersant" 02/07/2012, sumnіvno
Italic the data was seen.

Board numbers:

Dzherela:
We are ready to have nuclear surface ships - Andriy Fomichov. Site http://flotprom.ru, 2012.
Ships of the ship of the Navy of the SRSR and Russia. Website http://russian-ships.info, 2011
Lenta.ru. Website http://www.lenta.ru, 2012
The machine-building plant "Arsenal" produces the naval artillery shell. Website http://flotprom.ru, 2011
At the exhibition Euronaval-2010, the export version of the new Russian frigate was presented. Website http://www.flot.com, 2011
Frigate 22350. Site http://paralay.com, 2010.
Project 22350 frigate "Admiral Gorshkov". Website

January 24th, 2017

.
Chantly, it would not be great to say that I entered to the harmony (to the warehouse of strength of constant readiness) of the headfrigate pr. 22350 "Admiral Gorshkov" hundreds of thousands of citizens of Russia148 yew. special warehouse of the Navy (TheMilitary Balance 2016, page 189); 85,5 yew. USC staff (source for 2015, page 176); contractors; military pensioners, contractors and line workers who served in the fleet; shipbuilders, tі, scho vydіyshli vіd s rіznyh reasons, how to still shoot "steamboats" (for a moment); fans, what to chirp and just cicavi. It’s a pity, make it easier to go more properly, but still go.


1. "Admiral Gorshkov" on revision in the floating dock of the Pivnichnaya shipyard,21.01.2017 (PhotoCurious from forums.airbase.ru)


1. " Admiral Gorshkov "

I guess: the ship was laid down01.02.2006 , launching29.10.2010 (through4,74 roku), rozpochav mooring tests30.07.2013 (Sche through2,75 date), factory moves −18.11.2014 (upper viyshov by the sea), states −19.10.2015 , i todosi not transferred to the fleet. Three cobs of ZXI passed2,18 rock from the day of bookmark −11 years ( 10,98 ).

22-30.09.2015 "Gorshkov" zdіysniv inter-fleet crossing on the route Baltіysk-Siverodvinsk −2240 miles (per version Ministry of Defense, approx. 3000 miles −1 ) for 8 dіb іz average shvidkіst11,7 vuzla, for the passage of the state to try theUV polygons. There, the frigate fired anti-ship missiles, CRBD, as well as the A-192 guns (calling for everything, successfully -help 2 ). Crimea, 25.08.2016there was a notification about the final settlementproductive shooting air defense systems (more precisely, air defense systems) "Poliment-Redut" (after additionalChief of the Main Directorate of Military Affairs of the RF Legislative Assembly at the Single Day of Acceptance of Russian Productsthat zvіlnennya general director NVO "Diamond") ( 3 , force 4).

26.10-03.11.2016 (pictured with the "spygun" photo, posted on Twitter −help 5 ) the ship is guilty of the viconati returnMFP Pivnichnomorsk-Baltiysk-SPb (2400 miles, 8 deb, 12.5 knots), but hovering near Baltiysk.14.11.2016 "Gorshkov" having spent a report from TV Zirka near the frame for an hour of tactfulNavchan BF (together with the corvettes "Kmіtlivy" and "Stіyky") (6 ), 22.11 viyshov from Baltic and early vranci24.11 arrived at the Pivnichna shipyard for "revision of all mechanisms and systems" (7 ). Approximately in the middle of the chest, the frigate stood at the floating docks of the NE (8 ); Before raine information about "Admiral Gorshkov" (24.12.2016 ) to say that there will be transfers to the fleet "at the next month " ( 9 ).

addendum . Ymovirno, note from the factory newspaper Pivnichnoi shipyard: "Novini . "Gorshkov" standing at the dock . 921st request moved to dock. For the tribute of the senior officer "Gorshkov" Kiril Myadzyuti, a complexrobit, zokrema: a look at the kingston boxes and the gvinto-kerm group; farbuvannya underwater part of the hull, anchor lances and anchors; cleansing of shovels of guintiv. Also, there is an antifouling coating, which took away the mechanical damage during the hour of the ship’s rebuking at the ice; frequent testing of bottom-side fittings is carried out. From the other side, the cleansing of the ash-water systems is consummated; pass revision of mechanisms and control; get used to respect, otrimani try it for an hour" (10 ).

P. S. There was no official news about "Gorshkov" for a whole month, and the axis of this year ( 25.01 ) V 12:22 -12:37 − through 13,5 year. afterpublication of this record ( 24.01 22:55 ), central ZMI voiced the statement of the head of the USC about the transfer of Chernobyl right-hander the term for the transfer of the ship to the fleet - at the end of the fall 2017. (strength 24, strength 25). I understood, I don’t have and I can’t have innocence at the link between the names of the podiaProte similar zbіgіv for an hour of my blogging was already chimalo .

2. " Admiral Kasatonov "

mortgages26.11.2009 , launching12.12.2014 − through5,04 fate, spent more than an hour on the stocks, lower lead, which is nonsense on the ship. For unofficial information, for example 2014 - on the cob 2015 r.r. scho viyshov out of tune in the most On the cob ZXI gas turbine engine "Gorshkov" (DA91P1, wine M90FR) buv replacement novim z "Kasatonov" (11 ), Aitself - sent for repairs to the NVO "Saturn" (metro Ribinsk). Appointments at the protocol of differences before the contract dated 16.02.2015 between "Saturn" and SV The term vikonannya robit(AMD update - 10.2016, testing - 12.2016) don't give credit for what repairs of engines have already been delivered to St. Petersburg and installed on donor ships.

The dismantling and installation of gas turbines is not my main profile, but I need to make sure that the replacement of HMD (to be installed at the points of maneuverable base) cannot be a great problem. My colleague confirmed my convictionSlavus from Maritime Forum Aviabasy: "In the minds of the plant, the replacement of the turbine ("cigars"), for the normal organization of work, for the improvement of the possible and unacceptable smoke breaks and obidiv− takes a maximumfive working days . When designing a ship gas turbinethe replacement of the turbine in the process of operation is structurally laid ... the turbine itself. Reshta: a frame with an oil tank, a gas pipeline has already been standing for a long time. [Pipeline] piping is minimal there, and hanging aggregates are also not rich. If a turbine is installed, installation of hanging units and binding, a special warehouse to work for production "(12 , 13 ).

What is said in the citation is a streak of optimism for the completion of the life of the frigate, like and іnshіreminders, how to talk about those whothe robot is collapsing: as of 01/13/2016, the ship is 81% ready (help 14 ) − mountedelectromechanical possession, electric power was taken from the shore, the preparation of shipboard systems was completed, tanks were prepared for the reception of water, the fire of that olії, electrical installation works were completed (15 ) ; as of March 29, 2016, both systems of power plants and shipboard systems with service mechanisms were installed and tested, electrical installation work was completed, food was provided at the main switchboard at the bow and stern power plants, the arrangement was shifted to the state no lighting, pink lining and possession of living quarters, room for the crew 2016 r. (16 ) ; as of 06/23/2016, the head caliber was mounted (help 17 ) - 2x8 UKR 3S14; "Pid Yalinka" (December 30, 2016) brought a garmata (18 ) - AU A-192.

With the rest of the recent tributes, the testing of "Admiral Kasatonov" (maybe, factory moves) will open up inflow 2017, and the transfer of the "first serial" frigate pr. 22350 to the Navy is plannedfor the end of 2017 - the beginning of 2018 (help 19 ) − throughvіsіm fate after mortgage.

3. " Admiral Golovko "

mortgages01.02.2012 ( five fate), launch obіtsyat atIIIsq. 2017 (help 20 ). Zgіdno with front obіtsyankoy(given 07/28/2016 - total for the month with a small attack! ) (help 21 ). Judging from the photo taken on October 28, 2016, the vice-president of the USC was clearly bluffing - a corps of formations, but not farbows, that and "Saturn"More delivery of AMD for the Russian Navy only in the "magic" end of 2017 - on the cob 2018 r.r. (help 22 ). Let us know that the UECthat USC should be invested in voicing the terms - at which time the ensign should be raised next in 2020.

4. " Admiral Isakov "

mortgages14.11.2013 ( 3,2 rocks to that). As of today, it seems less likely, that, zgidno with the contract between the SV and Saturn, the supply of two diesel-gas turbine units (DGTA) M55R may be signed in lipnі-serpnі 2018 r. (help 23 ). ЄI hope that "Head" and "Isakiv" will be transferred to the Navy in one rotation (it would have been even more effective,yakbyactive and pidyom ensigns on both ships were seenone day ) ( ) .

Visnovok

Chi having launched the project for 11 years, what will be the lead ship? It’s not surprising, there is nothing - nothing perfect for the performance characteristics (not seeming about the ship’s aesthetics) was created in this class (subclass) behind the cordon. To improve the fact that rocket and radio engineering 22350 was improved and improved by stretching the common term of everyday life, it is possible buy a new frigate with a collection of wine, as if with rocks it becomes even more beautiful. Here the smut does not overdo it and transfer the series to the Navy as soon as possible - otherwise the wine will turn into an ocet.


2. "Gorshkiv" at the BF training,14.11.2016 (screenshot from the program "Serving Russia" on November 20, 2016 TRK "Zirka" from the submissionadm-in , forums.airbase.ru)


3. "Admiral Gorshkov" at the Baltic Sea, 22.11.2016 09:55-09:57 (photoDragon 64 from forums.airbase.ru)

8-9. Arriving "Admiral Gorshkov" to St. Petersburg,24.11.2016 , wound (photoRussianArms from forums.airbase.ru)


10. "Admiral Gorshkov" on revision in the floating dock of the Pivnichnaya shipyard,21.01.2017 (PhotoCurious from forums.airbase.ru)


11. "Admiral Kasatonov" beside the Dobudovnaya embankment Pivnichnaya shipyard,28.10.2016 (PhotoCurious from forums.airbase.ru)

12. "Kasatonov" at Pivnichniy shipyard,13.12.2016 (PhotoVAM from forums.airbase.ru)

13-15. "Admiral Kasatonov", NEkrimchanin , forums.airbase.ru, published on 21.12.2016)

16. "Admiral Golovko" on the slipway in the elinga Pivnichnaya shipyard,28.10.2016 (PhotoCurious from forums.airbase.ru)

17. Nayimovirnishe, "Admiral Isakov" (in the background) in the SV Elinga (screenshot from the program "Polygon" to TV channel T24, released on 15.01.2016 from submissionBig LoM 1 , forums.airbase.ru)